Home page
SPONSOR AD

Topic: MSD Street Fire Install

in Forum: C3 Electrical

MSD Street Fire Install

Posted: 4/5/09 6:12pm Message 11 of 11
Lifetime MemberLifetime Member
Send PM
Lanoka Harbor, NJ - USA
Joined: 12/21/2006
Posts: 828
Vette(s): 1975 metallic blue coupe with t-tops,L48, t/t steering, black leather interior. 1990 L98, white/red leather interior, auto,a/c
[QUOTE=fedexbicman76]Go for it Eddie, it made a lot of difference and I am quite pleased. It took me a bit longer than the instructions suggest but, I always take longer to do things when it's my first time at it. I could probly get it under an hour and a half if I did another one on a 76. I would imagine a 75 would be much the same. Good luck...[/QUOTE]

that is the only way to be is careful the first time you do anything. better to get it right than cause yourself more headaches. first one is always the hardest one anyway and after you are done and realize how easy it was you feel a lot better.Thumbs Up



LIFETIME MEMBER #97
THE DYNAMIC DUO


in Forum: C3 Electrical


SPONSOR AD: (Our Sponsors help support C3VR)